Home
Products

New-design Electric Hoists

New-design Bridge Cranes

Special Cranes

General-purpose Cranes

Core Technology

Intelligent Control

Silent Transmission

Modular Structure

Lightweight Structur

Crane Accessories

Parametric Design

Quality Assurance

Informatization

Quality Assurance

Service

Service Center

Specifications

Installation Guide

Order Tracking

About Us

Company Profiles

Company Culture

Social Care

Videos

New Media Centre

Contact Us

Contact

Map navigation

chinese english
Search
MENU
Home
Products
Core Technology
Quality Assurance
Service
About Us
Join us
Contact Us
Sales Hotline

400-002-5557

News

Nucleon is a professional crane manufacturer and material handling solution provider.

  • Company Profile
  • Company Culture
  • Social Care
  • News
  • Videos
  • New Media Centre
Home > News

Safe Operating Procedures

2022-06-13

Publisher:Nucleon browse:1965second

Please don’t lift in case of the following situations:

1. The crane and its safety devices and braking devices have abnormal noises;

2. The state and weight of the object are unknown, or overload;

3. The sling is unqualified, and the sling is damaged;

4. Unbalanced or loose heavy objects;

5. Objects with sharp edges and without pads;

6. Uneven pulling, or using it to hang the workpieces just for convenient processing;

7. Charged objects and buried objects;

8. Hazardous chemicals without safety measures;

9. Person or floating objects on the heavy objects;

10. There is no special person to guide, the guide signal is unclear or the without good view.


Please don’t lift in case of the following situations:

1. Lifted object may bump into other objects;

2. People without leaving the safe zone;

3. Hang the workpieces just for convenient processing;

4. The hook has no anti-unhook device or the hanging object is easy to slip off with the hook;

5. 2 or more steel plates lifted at one time with clamps;

6. The lifting beam is higher than 1.5 meters from the ground or and there is no rope at both ends of the lifter beam;

7. Hanging chains, wire ropes, steel plates, etc. are pulled out under the hanging objects, which are easy to overturn the objects;

8. The hooks, clips, ropes and chains without leaving the hanging object;

9. There is people under the crane;

10. Thunderstorm days, strong winds above level 6.


Please don’t run the crane in case of the following situations:

1. There is ropes, clip, chains on the hook, and no one help;

2. There are people, objects, and wires beside the track;

3. There is no bell, or the bell does not ring, or people don’t leave when ringing;

4. Crane may collide with other cranes or objects.

5. rainy days or foggy days without good views.


Please report it in case of the following situations:

1. Weld Cracking of ladder rail;

2. The glass is broken;

3. Rotten of insulation board, and there is a leakage of electricity;

4. The crane is not parked properly due to power failure or crane damage;

5. Anyone who violates the regulations.


Safety Operation Rules for Crane Drivers



1. Crane drivers are special operators, who must accept the professional safety technical training, pass the examination and obtain the Special Equipment Safety Operation Certificate, be familiar with the national standard command signals.

2. Check carefully the machinery, electrical appliances, control systems, safety protection devices, safety devices, signal devices, and fire extinguishers, to confirm the interlock and limit device are flexible and reliable, and they shall be recorded in the shift record book;

3. Drivers shall walk and get up and down on the designated safe passages and dedicated platforms. The driver must concentrate on the operation, and are not allowed to engage in distracting activities (playing with mobile phones, chatting, etc.). The crane should ring the bell first when starting, hoisting, placing objects, asking for avoidance or prompting attention.

4.The driver must press the signal of the lifting commander, and can operate after getting the accurate command signal. When the command signal is unclear, the driver shall use the bell to send out a repeated signal to confirm the commander, and the operation can be carried out only after the command intention is clear.

5. When lifting heavy tonnage objects, test lifting must be carried out before lifting. Lift the heavy objects within 30 cm of the ground or support, stop and observe, and confirm that the slings, lifting objects, and the crane are stable, and there is no abnormality or abnormal noise before lifting.

6. In the event of multiple (two or more) commanding or illegal commanding, the driver has the right to refuse the operation.

7. When using the sling to lift, turn over, and transfer, you must observe it, keep away from objects with edges, corners and openings, and prevent the sling from breaking and causing accidents due to touch. For cranes with main and auxiliary hooks, raise the unused hooks to the top during operation. It is strictly forbidden to use two hooks to lift two objects at the same time, and it is forbidden to operate three handles or buttons at the same time.

8. If someone is in the dangerous area. Do not use the crane. When the hook is close to the lifting limiter, and the crane or trolley are near the terminal to meet other cranes, the speed should be slowed down, and use the jog operation. Reverse operation is not allowed to replace the brake operation, don’t use limiter replaces the parking, don’t use emergency stop switch replaces the ordinary switch. Objects long stay hanging are not allowed.

9. If there is a sudden power failure during operation, the switch handle must be turned to the "zero" position, and the hanging object is not put down or the sling is not unhooked, and it is not allowed to leave the driver's cab. If the power cannot recover for a while, corresponding measures should be taken (slowly loosening the lifting brake manually) to lower the hanging object.

10. If the brake fails and the hanging object slides down automatically during the hoisting, the driver must keep calm. First of all, sound a warning to make other personals quickly avoid it, and at the same time, the reverse jog shall be done, move the hanging object to the empty space, and slowly drop the hanging object to the ground.

11. When the open-air crane encounters heavy rain, lightning, heavy fog or strong winds above level 6, relevant emergency plans should be installed and implemented. Stop the work, cut off the power, lock with the rail clamp and plug the iron shoes at the same time, and insert the anchoring device.

12. After the work is over, the crane shall stop at the specified position, raise the hook, drive the trolley to the end, and return all the control handles to the "zero" position to cut off the power supply. The open-air crane should be locked by the rail clamp, the iron shoes should be plugged, and the anchor should be inserted.


上一篇:Nucleon Won the Title of AAAAAA-level Standardized Good Behavior Enterprise
下一篇:纽科伦公司举行“党员义务劳动,厂区大清理”活动
Related articles
Nucleon Passed the Supervision and Audit of Five-star Service Certification Nucleon Passed the Supervision and Audit of Five-star Service Certification

Nucleon Approved as "Henan Intelligent Factory"

纽科伦公司双梁三班和曹坤鹏同志在长垣市四项竞赛活动中分别荣获“先进班组”和“首席员工”荣誉称号

Links: 中国及多国专利审查信息查询网工标网 中国重型机械工业协会
Quick search   
  • New-design Electric Hoists
  • New-design Bridge Cranes
  • Special Cranes
  • General-purpose Cranes
  • Products

    New-design Electric Hoists

    New-design Bridge Cranes

    Special Cranes

    General-purpose Cranes

  • Core Technology

    Intelligent Control

    Silent Transmission

    Modular Structure

    Lightweight Structur

    Crane Accessories

    Parametric Design

  • Quality Assurance

    Informatization

    Quality Assurance

  • Service

    Service Center

    Specifications

    Installation Guide

    Order Tracking

  • About Us

    Company Profiles

    Company Culture

    Social Care

    Videos

    New Media Centre

TikTok QR Code
WeChat QR Code
Homepage QR Code
Contact 400-002-5557

Tel:+860373-8622016

Fax:0373-8622001

Email: nucleon@nucleon.com.cn

Address:crane indusry park, Changyuan City, Henan Province, China

Copyright © 2002-2022 Nucleon (Xinxiang) Crane Co., Ltd Nucleon (Xinxiang) Crane Co., Ltd
ICP:豫ICP备2021005057号-1
  • service

    Online Service

  • Tel

    0373-8622016

  • WeChat

    Scan WeChat

  • Tiktok

    Scan Tiktok

  • website

    Scan website

  • Top

    Back to top